I want to calculate Demurrage value upon actualization of discharge line in nomination in an FOB OP/DX scenario.System calculates the:
a) Potentuial Latime
b) Allowable Laytime but NOT the demurrage value
Following are the config settings I have done.
In TD-->Ship Costs-->Pricing-->Pr Control I have created Pricing proced: PricingProc FSCM01 and maintained DM10 as an access sequence
Defined Demurrage Rate DM10 as:
Cond class: Prices
Cond Typ: daily pr
Cond Category: Freight
Defined Demurrage Factor DMFC as:
Cond class: Discount/Surcharge
Cond Typ: percentage
Cond Category: Freight
In TSW--> Laytime and Demurrage I have defined
Laytime term defaults
Assign Laytime filter to relevance type
All the BADI's for TSW LayT and Demurrage are activated
In Freight Contract: In TSW Details Laytime tab: Defined demurrage as
Demurrage rate DM10
Despatch rate DM10
Calcul. factor DMFC
Defined Laytime as:
Window per. ev. E4 Load start
Timebar start E4 Load start
Total laytime 72 HR/70.000 TO
Discharge layt. 72
Min. laytime 24 HR
I want to specify the demurrage rates and input the demurrage factor as 100%. Am I missing any config for the system to calculate the demurrage value.
Request HELP.