Hi All,
I am facing this issue during STO processing using mvt scenario 15 & 16. Let say that i have 5Mt of material stock left at plant A(dispatch plant). When create the load ticket(mvt-15) for the same qty , the ticket is created successfully. Now when i do the unloading ticket(with mvmt 16) the delivery doc gets created with the following error message-"only 0 MT of material available".
I have checked the stock, and the stock is available for at the dispatch plant. Am i missing some configuration settings ?
regards
srinivas