Quantcast
Channel: SCN : Popular Discussions - SAP for Oil & Gas
Viewing all articles
Browse latest Browse all 2091

Issue with Loading confirmation when in-transit sloc is changed

$
0
0

Hello,

I have a requirement for my client where the existing TD process has to be done with an additional in-transit location.

First the stock is transferred from main sloc to in-transit sloc using 311, followed by stock out from in-transit to customer sloc using 641.

now, in this process a new in-transit sloc has to be created for the new customer.

So after bulk schedule in o4f1, while loading confirmation is done in o4g1 following steps are followed:

1. I goto “Rebrand/Load bulk detail” tab, select line and activate the proposal (Ctr+F5), now QCI conversion happens (pop up screen is displayed, press continue).

2. Then i go back to Load Bulk screen and change In transit SLoc from SV11 to SV12

3. Then select line and activate “Confirm loading” on this i get below message:

4. Loading confirmation complete and document saved.Status of Shipment changed to 3. And afterwards whenever I try changing the loading confirmation i get this error.

 

What i can figure out is that the issue is that i am changing in-transit sloc from SV11 to SV12, but is it not possible to have 2 in-transit sloc and properly do re-branding. Please suggest

 

PFA the issue slongwith screenshot.


Viewing all articles
Browse latest Browse all 2091

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>